The Michelson

This LEED Gold Class-A office tower installed the LOBOS demand response component in 2010, utilizing custom incentives offered by Southern California Edison under their TA/TI (Technical Assistance/Technical Implementation) rebate program. The LOBOS Energy Efficiency platform is planned for commissioning in 2013.

Size:
531,000 sq ft
Use:
Commercial Office
Location:
Irvine, CA
Installed:
2010
Automated Demand Response Capacity:
436 kW
Featured Project PDF

get Lobos

We’re glad you’re excited about LOBOS. Give us a bit of info, and we’ll help you get LOBOS in your building, project or product.

thanks for contacting us!

We'll be in touch soon. If we're not in touch soon enough, feel free to give us a call at (714) 632-0227.

ask an engineer

Want to get in touch with a LOBOS engineer? Fill out this form and a member of our engineering team will get you the answers you need.

thanks!

We got your message and we'll be in touch soon.

contact Lobos

  • *Required Fields Modal

thanks for contacting us!

We'll be in touch soon. If we're not in touch soon enough, feel free to give us a call at (714) 632-0227.