Inland Center Mall

Originally built in the 1960s, the Inland Center Mall contains three major anchor department stores and over 130 smaller shops and services. The mall is located in San Bernardino, CA, where summertime temperatures often exceed 100°F.

In 2008, LOBOS was installed to reduce the mall’s HVAC energy use.

Once installed, the LOBOS system was able to optimize the facility’s chilled water and air-handling systems in order to achieve significant energy savings. The result has been an energy efficient system that saves more than $360,000 a year in energy costs.

Size:
932,709 sq ft
Use:
Regional Mall
Location:
San Bernardino, CA
Installed:
2008
Annual Cost Savings:
$360,000
Automated Demand Response Capacity:
254 kW
Featured Project PDF
"If we reduce usage anymore, we can turn everything off and go home! Overall usage down an amazing 55.89% from last year. HVAC usage down 86.59% from last year."
- David Manley, Operations Manager, Inland Center Mall

get Lobos

We’re glad you’re excited about LOBOS. Give us a bit of info, and we’ll help you get LOBOS in your building, project or product.

thanks for contacting us!

We'll be in touch soon. If we're not in touch soon enough, feel free to give us a call at (714) 632-0227.

ask an engineer

Want to get in touch with a LOBOS engineer? Fill out this form and a member of our engineering team will get you the answers you need.

thanks!

We got your message and we'll be in touch soon.

contact Lobos

  • *Required Fields Modal

thanks for contacting us!

We'll be in touch soon. If we're not in touch soon enough, feel free to give us a call at (714) 632-0227.